MBW , Metropolitan Board of Works x Metropolitan Board of Works Corporation of London x City of London Battersea Bridge Company Fulham Bridge Company Staines Bridge Commissioners Vauxhall Bridge Company Strand Bridge Company

Identity area

Type of entity

Authorized form of name

MBW , Metropolitan Board of Works x Metropolitan Board of Works Corporation of London x City of London Battersea Bridge Company Fulham Bridge Company Staines Bridge Commissioners Vauxhall Bridge Company Strand Bridge Company

Parallel form(s) of name

    Standardized form(s) of name according to other rules

      Other form(s) of name

        Identifiers for corporate bodies

        Description area

        Dates of existence

        History

        When the London Coal and Wine Duties Continuance Bill was before the House of Commons in 1868, it met strong opposition. The suggestion was made that some compensation should be given by setting free the bridges across the Thames and Lea. This suggestion was embodied in the Act of 1868 by which the duties for the year 1888-9 were to be applied in the first instance to freeing from toll the following bridges: Kew, Kingston, Hampton Court, Walton and Staines on the Thames, and then Chingford and Tottenham Mills Bridges (including Hellyer's Ferry Bridge) upon the River Lea. These objects were provided for by the Kew and other Bridges Act of 1869 and an amendment Act of 1874 by which a Joint Committee of the Corporation of London and the Metropolitan Board of Works was appointed. The Coal and Wine Duties of 1888-9 were allocated as security for raising the necessary funds. The total cost of the purchase of the bridges was £155,485.2.0.

        Staines Bridge was of Roman origin and was for many centuries the first bridge across the Thames above London. The newest bridge was built in 1828-1834. The title deeds of this bridge include many relating to the approaches of the old bridge, the site of the Bush Inn and Gardens. At the time of the freeing of the bridge, it was owned as a public trust. After negotiation the Solicitor to the Committee obtained agreement among the bondholders to accept a quarter of the capital sum, and a verdict for this amount was given on 2nd August 1870. The bridge was opened free of toll on 25th February 1871.

        Battersea Bridge was built in 1771-2. It was constructed from wood to the designs of Henry Holland to replace the ferry between Chelsea and Battersea. The bridge was demolished in 1881 as boats often collided with the piers, but it had already contributed to the growth of Chelsea from a village to a small town. The present bridge with cast iron arches and designed by Sir Joseph Bazalgette was erected 1886-90.

        Fulham Bridge, now known as Putney Bridge, was a timber bridge built between 1727 and 1729 to a design by Sir Jacob Ackworth. Until 1750 it was the only bridge across the Thames west of London Bridge. The Metropolitan Board of Works purchased the bridge in 1879 and freed it from tolls. It had been damaged by a barge in 1870 and the MBW set about commissioning a new, granite bridge from Sir Joseph Bazalgette, completed in 1886 and still standing.

        Waterloo Bridge, designed by Rennie, was built by a private company which obtained an act of Parliament for that purpose in 1809. Work began in 1811 and the original intention was to use the name 'Strand Bridge'. The project was renamed 'Waterloo Bridge' in 1816, a year before it opened in 1817. In 1878 it was acquired by the Metropolitan Board of Works and the existing tolls were abandoned. Structural defects were soon discovered and repaired, but in the 1920's, the bridge was declared unsafe. The London County Council replaced it with a design by Sir Giles Gilbert Scott which was erected 1939-1944.

        Vauxhall Bridge was begun in 1811 to a design by Rennie, but two years later the Vauxhall Bridge Company decided to adopt James Walker's cast iron design as it was cheaper. The bridge was opened in 1816 and was at first called Regent's Bridge. It was the first iron bridge over the Thames. In 1895 to 1906 a new bridge was constructed designed by Sir Alexander Binnie.

        Places

        Legal status

        Functions, occupations and activities

        Mandates/sources of authority

        Internal structures/genealogy

        General context

        Relationships area

        Access points area

        Subject access points

        Place access points

        Occupations

        Control area

        Authority record identifier

        Institution identifier

        Rules and/or conventions used

        Status

        Level of detail

        Dates of creation, revision and deletion

        Language(s)

          Script(s)

            Sources

            Maintenance notes