In the early nineteenth century, London's water supply and the River Thames were heavily polluted with sewage. This resulted in several cholera outbreaks during which up to 20,000 people died annually. In 1858, Parliament instructed the newly formed Metropolitan Board of Works to remedy this situation.
Joseph Bazalgette, the Engineer of the Metropolitan Board of Works, was charged with finding a solution to these problems. His answer consisted of the construction of intercepting sewers north and south of the Thames, and immediately adjacent to the river. These were to receive the sewage from the sewers and drains which up to now had connected directly into the Thames. Until this time, Thames-side in central London was not protected by an embankment, and consisted of mud, shingle and sewage, onto which these various drains, outlets and ditches had discharged. Between 1856 and 1859, 82 miles of brick intercepting sewers were built below London's streets, all flowing eastwards. These were connected to over 450 miles of main sewers, themselves receiving the contents of 13,000 miles of small local sewers, dealing daily with half a million gallons of waste.
The major pumping stations were located at Abbey Mills near West Ham, and at Crossness itself on the south bank. The southern system contained three levels of intercepting sewers. The Low Level Sewer from Putney to Deptford picked up the Bermondsey branch and was joined by the High Level Sewer from Balham and the higher Effra Branch from Crystal Palace and Norwood; these combined at Deptford, and there lifted some twenty feet to discharge directly into the Thames at Deptford Creek. By 1860, work was proceeding on the Southern Outfall Sewer, and this, when complete, took the effluent from Deptford via Plumstead, and thence to Crossness. Here the sewage was pumped up into a reservoir 6.5 acres in extent by 17 feet deep, holding 27 million gallons, and was released at high tide to flow out on the ebb, towards the sea.
There was no attempt to treat the raw sewage: Bazalgette's concern was to get rid of it. Since the success of the enterprise rested on the use of the tides - two in each 24 hours - it follows that the reservoir had to be emptied in six hours, in order to utilise all of the ebb tide. In fact, to give some margin of safety, emptying had to take place in less time than this. And as soon as the ebb tide began to turn, the outlet culverts from the reservoir were closed by penstocks, and pumping continued, raising the incoming sewage from the deep-level culverts into the reservoir. Just before high tide in the river, the sluices connecting the reservoir and the river would be opened.
The Southern Outfall Works, as the complex at Crossness was originally called, was officially opened on April 4th 1865, by HRH The Prince of Wales (later Edward VII). Following an address by Joseph Bazalgette, the Royal party toured the works and reservoirs, and the Prince then turned the wheel which started the engines. Following that, in the true Victorian spirit, the "Prince and five hundred guests sat down to an excellent dejeuner, in one of the ancillary sheds, beside the Engine House".
Source: http://www.crossness.org.uk/
Entidade detentora
História do arquivo
ACC/2766 1881-1886 Collection 0.05 linear metres Southern Outfall Works x Crossness Pumping Station
In the early nineteenth century, London's water supply and the River Thames were heavily polluted with sewage. This resulted in several cholera outbreaks during which up to 20,000 people died annually. In 1858, Parliament instructed the newly formed Metropolitan Board of Works to remedy this situation.
Joseph Bazalgette, the Engineer of the Metropolitan Board of Works, was charged with finding a solution to these problems. His answer consisted of the construction of intercepting sewers north and south of the Thames, and immediately adjacent to the river. These were to receive the sewage from the sewers and drains which up to now had connected directly into the Thames. Until this time, Thames-side in central London was not protected by an embankment, and consisted of mud, shingle and sewage, onto which these various drains, outlets and ditches had discharged. Between 1856 and 1859, 82 miles of brick intercepting sewers were built below London's streets, all flowing eastwards. These were connected to over 450 miles of main sewers, themselves receiving the contents of 13,000 miles of small local sewers, dealing daily with half a million gallons of waste.
The major pumping stations were located at Abbey Mills near West Ham, and at Crossness itself on the south bank. The southern system contained three levels of intercepting sewers. The Low Level Sewer from Putney to Deptford picked up the Bermondsey branch and was joined by the High Level Sewer from Balham and the higher Effra Branch from Crystal Palace and Norwood; these combined at Deptford, and there lifted some twenty feet to discharge directly into the Thames at Deptford Creek. By 1860, work was proceeding on the Southern Outfall Sewer, and this, when complete, took the effluent from Deptford via Plumstead, and thence to Crossness. Here the sewage was pumped up into a reservoir 6.5 acres in extent by 17 feet deep, holding 27 million gallons, and was released at high tide to flow out on the ebb, towards the sea.
There was no attempt to treat the raw sewage: Bazalgette's concern was to get rid of it. Since the success of the enterprise rested on the use of the tides - two in each 24 hours - it follows that the reservoir had to be emptied in six hours, in order to utilise all of the ebb tide. In fact, to give some margin of safety, emptying had to take place in less time than this. And as soon as the ebb tide began to turn, the outlet culverts from the reservoir were closed by penstocks, and pumping continued, raising the incoming sewage from the deep-level culverts into the reservoir. Just before high tide in the river, the sluices connecting the reservoir and the river would be opened.
The Southern Outfall Works, as the complex at Crossness was originally called, was officially opened on April 4th 1865, by HRH The Prince of Wales (later Edward VII). Following an address by Joseph Bazalgette, the Royal party toured the works and reservoirs, and the Prince then turned the wheel which started the engines. Following that, in the true Victorian spirit, the "Prince and five hundred guests sat down to an excellent dejeuner, in one of the ancillary sheds, beside the Engine House".
Source: http://www.crossness.org.uk/
Document rescued from a skip and passed to the archive 11 October 1989 by a Mr G Saul (ACC/2766).
Laboratory notebook possibly compiled in laboratories at Crossness Pumping Station, Belvedere Road, Abbey Wood, SE2; containing wide range of analyses including: water quality, gas testing, Thames mud, sand, sewage, cow shed water, asbestos, petroleum, and so on. Several entries concern a Thames Pollution enquiry. The volume also contained 'Oxygen Sag Curve' analyses of the Thames. It is probable that the work was carried out for the Metropolitan Board of Works.
One volume.
Available for general access
Copyright: City of London
English
Fit
Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm
A Popular History of Crossness by Ian G Hampson.
Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997. April to June 2009 Bazalgette , Sir , Joseph William , 1819-1891 , Knight , civil engineer Industrial facilities Waterworks Water resources Sewage works Surface water Rivers Mechanical equipment Hydraulic equipment Pumping stations Environmental engineering Sanitation Waste disposal Sewage disposal Environmental degradation Pollution Water pollution MBW , Metropolitan Board of Works x Metropolitan Board of Works Southern Outfall Works x Crossness Pumping Station Thames, river England UK Western Europe Abbey Wood Greenwich London Europe Facilities
Fonte imediata de aquisição ou transferência
Document rescued from a skip and passed to the archive 11 October 1989 by a Mr G Saul (ACC/2766).
Zona do conteúdo e estrutura
Âmbito e conteúdo
Laboratory notebook possibly compiled in laboratories at Crossness Pumping Station, Belvedere Road, Abbey Wood, SE2; containing wide range of analyses including: water quality, gas testing, Thames mud, sand, sewage, cow shed water, asbestos, petroleum, and so on. Several entries concern a Thames Pollution enquiry. The volume also contained 'Oxygen Sag Curve' analyses of the Thames. It is probable that the work was carried out for the Metropolitan Board of Works.
Avaliação, seleção e eliminação
Incorporações
Sistema de arranjo
One volume.
Zona de condições de acesso e utilização
Condições de acesso
Available for general access
Condiçoes de reprodução
Copyright: City of London
Idioma do material
- inglês
Sistema de escrita do material
- latim
Notas ao idioma e script
English
Características físicas e requisitos técnicos
Instrumentos de descrição
Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm
Zona de documentação associada
Existência e localização de originais
Existência e localização de cópias
Unidades de descrição relacionadas
Nota de publicação
Zona das notas
Nota
Identificador(es) alternativo(s)
Pontos de acesso
Pontos de acesso - Assuntos
- Industrial facilities
- Water resources
- Water resources » Surface water
- Water resources » Surface water » Rivers
- Mechanical equipment
- Mechanical equipment » Hydraulic equipment
- Environmental engineering
- Environmental engineering » Sanitation
- Environmental engineering » Sanitation » Waste disposal
- Environmental degradation
- Environmental degradation » Pollution
- Environmental degradation » Pollution » Water pollution
Pontos de acesso - Locais
Pontos de acesso - Nomes
Pontos de acesso de género
Zona do controlo da descrição
Identificador da descrição
Identificador da instituição
Regras ou convenções utilizadas
Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
Estatuto
Nível de detalhe
Datas de criação, revisão, eliminação
Línguas e escritas
- inglês