Área de identidad
Tipo de entidad
Forma autorizada del nombre
English and Bristol Channels Ship Canal Company
Forma(s) paralela(s) de nombre
Forma(s) normalizada del nombre, de acuerdo a otras reglas
Otra(s) forma(s) de nombre
Identificadores para instituciones
Área de descripción
Fechas de existencia
Historia
It appears that the English and Bristol Channels Ship Canal was never actually built. Two proposals were originally considered. First was a route from the south coast at Seaton through to Bridgewater, the second running further west via Taunton and Exeter. At the time of these records a Bill was passed in Parliament allowing the building of a canal from Bridgwater Bay to Beer near Seaton. The canal would have been 44 miles long with 60 locks. By 1828 the company announced they had failed in raising the necessary money to get the project off the ground.