Zone d'identification
Type d'entité
Forme autorisée du nom
forme(s) parallèle(s) du nom
Forme(s) du nom normalisée(s) selon d'autres conventions
Autre(s) forme(s) du nom
Numéro d'immatriculation des collectivités
Zone de description
Dates d’existence
Historique
Early Commissioners of Sewers were solely concerned with land drainage and the prevention of flooding, not with the removal of sewage in the modern sense. In 1531 an Act of Sewers was passed which set out in great detail the duties and powers of Commissioners and governed their work until the 19th century. Gradually a permanent pattern emerged in the London area of seven commissions, five north and two south of the Thames, with, after the Great Fire, a separate commission for the City of London. The London commissioners had more extensive powers than those in other parts of the country; they had control over all watercourses and ditches within two miles of the City of London as well as newly constructed drains and sewers. After 1800 the London commissioners also obtained powers to control the formation of new sewers and house drains.
The first separate Commission for "the County of Kent from Ravensborne to Lombardes Wall", that is for Greenwich Marshes, was issued on 24 September 1624.