Área de identidad
Código de referencia
Título
Fecha(s)
- 1756-1869 (Creación)
Nivel de descripción
Volumen y soporte
0.3 linear metres
Área de contexto
Nombre del productor
Historia biográfica
The Hammersmith Bridge Company was established by Act of Parliament in 1824 (before the introduction of the principle of the limited company). The Bridge, designed by William Tierney Clark (or Clarke), was completed in 1827. A second Act, amending some sections of the first, was obtained in 1828 Land was compulsorily acquired in accordance with the provisions of the Acts for making the approach roads, which included Hammersmith Bridge Road and what is now Castelnau in Barnes. A special clause in the first Act meant that whole of the Barn Elms Estate had to be purchased. Most of the surplus land in Barnes and Hammersmith was subsequently sold; but some properties were retained and let to tenants.
The Company's income came largely from tolls on users of the Bridge and the roads in Barnes. Tolls were not charged on users of Hammersmith Bridge Road. A floating steamboat pier was later built to increase profits, attached to the downstream side of the Surrey suspension pier. In 1880 the Bridge and pier were purchased by the Metropolitan Board of Works, under the terms of the Metropolis Toll Bridges Act. The Company's roads were transferred to the local authorities, its properties were sold , and it was wound up. The Bridge was at once freed from tolls and was replaced by the present bridge a few years later.
Institución archivística
Historia archivística
GB 0074 DD/0478 1756-1869 Collection 0.3 linear metres Hammersmith Bridge Company
The Hammersmith Bridge Company was established by Act of Parliament in 1824 (before the introduction of the principle of the limited company). The Bridge, designed by William Tierney Clark (or Clarke), was completed in 1827. A second Act, amending some sections of the first, was obtained in 1828 Land was compulsorily acquired in accordance with the provisions of the Acts for making the approach roads, which included Hammersmith Bridge Road and what is now Castelnau in Barnes. A special clause in the first Act meant that whole of the Barn Elms Estate had to be purchased. Most of the surplus land in Barnes and Hammersmith was subsequently sold; but some properties were retained and let to tenants.
The Company's income came largely from tolls on users of the Bridge and the roads in Barnes. Tolls were not charged on users of Hammersmith Bridge Road. A floating steamboat pier was later built to increase profits, attached to the downstream side of the Surrey suspension pier. In 1880 the Bridge and pier were purchased by the Metropolitan Board of Works, under the terms of the Metropolis Toll Bridges Act. The Company's roads were transferred to the local authorities, its properties were sold , and it was wound up. The Bridge was at once freed from tolls and was replaced by the present bridge a few years later.
Discovered by computer consultants who took over a solicitors office and found this material left behind. They transferred it to BRA who deposited it at Hammersmith and Fulham Archives and Local Studies in 1975.
Transferred from Hammersmith and Fulham Archives and Local History Centre in 2015.
Records of Hammersmith Bridge Company including deeds and papers relating to land bought or owned by the company.
52 items.
These records are available for public inspection, although records containing personal information may be subject to access restrictions.
Copyright is held by the Depositor.
English
Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm
See also DD/0008 Records of the Hammersmith Bridge Company.
Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
Added July 2015. Hammersmith and Fulham Hammersmith Bridge Company Transport infrastructure Bridges London England UK Western Europe Europe Hammersmith
Origen del ingreso o transferencia
Discovered by computer consultants who took over a solicitors office and found this material left behind. They transferred it to BRA who deposited it at Hammersmith and Fulham Archives and Local Studies in 1975.
Transferred from Hammersmith and Fulham Archives and Local History Centre in 2015.
Área de contenido y estructura
Alcance y contenido
Records of Hammersmith Bridge Company including deeds and papers relating to land bought or owned by the company.
Valorización, destrucción y programación
Acumulaciones
Sistema de arreglo
52 items.
Área de condiciones de acceso y uso
Condiciones de acceso
These records are available for public inspection, although records containing personal information may be subject to access restrictions.
Condiciones
Copyright is held by the Depositor.
Idioma del material
- inglés
Escritura del material
- latín
Notas sobre las lenguas y escrituras
English
Características físicas y requisitos técnicos
See also DD/0008 Records of the Hammersmith Bridge Company.
Instrumentos de descripción
Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm
Área de materiales relacionados
Existencia y localización de originales
Existencia y localización de copias
Unidades de descripción relacionadas
Área de notas
Identificador/es alternativo(os)
Puntos de acceso
Puntos de acceso por materia
Puntos de acceso por lugar
Puntos de acceso por autoridad
Tipo de puntos de acceso
Área de control de la descripción
Identificador de la descripción
Identificador de la institución
Reglas y/o convenciones usadas
Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
Estado de elaboración
Nivel de detalle
Fechas de creación revisión eliminación
Idioma(s)
- inglés