The Metropolitan Water Board was established in 1902 under the terms of the Metropolis Water Act of the same year with a statutory area of 576 square miles, of which it directly supplied 540. Its Board met for the first time in 1903 and was composed of 66 members from every local authority concerned (some smaller authorities had joint representation) and the Lee and Thames Conservancies. This number was increased to 88 in 1956 (due to population growth) but reduced to 39 on the reorganisation of local government in 1965.
During 1903 and 1904 arbitration appeals were heard regarding compensation for the companies' shareholders and in 1904 the 'appointed days' for transfer of the undertakings took place, July 25 for the New River Company and June 24 for the rest. The new undertaking also included the areas covered by the Urban Districts of Enfield and Tottenham which had retained their own powers of supply (from wells) although they had also been heavily dependent on the New River and East London companies.
Its first task was to complete schemes inherited from the companies and effect the rationalisation of the eight separate undertakings, primarily in engineering, staffing, administration and water rates. To this end Staines reservoir was opened in 1904, the Kempton Park works in 1906, Walton reservoir in 1907, Honor Oak reservoir in 1909, and Island Barn reservoir in 1911.
Progress on the financial and administrative side was slower and politically sensitive especially in the rationalisation of water charges. Criticisms of the Board continued through the 1910's and eventually in 1919 it agreed to the setting up of a committee by the Ministry of Health under Sir Horace Monro to review the workings of the 1902 Water Act. The committee reported in 1920, largely supporting the Board's management of the undertaking and the resulting Metropolitan Water Board (Charges) Act of 1921 strengthened its financial position.
In 1914 the Round Pond was closed after three hundred years in operation and on its site in 1920 the Board's new headquarters at New River Head were opened. In 1936 another connection with the early history of the capital's water supply was broken with the decision to allow the lease on Hampstead and Highgate ponds to lapse. It had been in existence since 1543.
In 1947 a Departmental Committee was set up by the Ministry of Health on Greater London Water Supplies with a remit "To examine the present system of water supply administration in the Greater London area and to consider and report on the question whether changes in that system are desirable in the public interest and if so what should be the constitution, powers and duties of the new body or bodies in which control should be rented". The Board was in favour of, in effect, a single regional body based on the hydro-geological area of the London Basin but there was a great deal of opposition to the proposal and nothing of substance was enacted although indirectly it led to the creation of the Thames Water Authority in 1974.
The post war period saw the inauguration of a number of major schemes including the opening of the George VI reservoir at Staines in 1947, the William Girling reservoir at Chingford in 1951, the Ashford Common works in 1958, the Thames to Lee Valley trunk main (to supplement supplies from the River Lee) in 1960, the Elizabeth II reservoir at Walton in 1962 and the Coppermills Works (the last great project completed) in 1972. By 1974 the daily amount of water supplied by the Board had risen from an original 220 million gallons in 1904 to 420 million gallons (with peaks up to 500 million).
The Thames Water Authority came into existence under the 1973 Water Act on 1st August of that year. The last meeting of the Metropolitan Water Board took place on 29th March 1974 and the Authority assumed full control three days later.
Dépôt
Histoire archivistique
GB 0074 ACC/2558/MW/CC 1851-1909 Collection 4 linear metres Metropolitan Water Board
The Metropolitan Water Board was established in 1902 under the terms of the Metropolis Water Act of the same year with a statutory area of 576 square miles, of which it directly supplied 540. Its Board met for the first time in 1903 and was composed of 66 members from every local authority concerned (some smaller authorities had joint representation) and the Lee and Thames Conservancies. This number was increased to 88 in 1956 (due to population growth) but reduced to 39 on the reorganisation of local government in 1965.
During 1903 and 1904 arbitration appeals were heard regarding compensation for the companies' shareholders and in 1904 the 'appointed days' for transfer of the undertakings took place, July 25 for the New River Company and June 24 for the rest. The new undertaking also included the areas covered by the Urban Districts of Enfield and Tottenham which had retained their own powers of supply (from wells) although they had also been heavily dependent on the New River and East London companies.
Its first task was to complete schemes inherited from the companies and effect the rationalisation of the eight separate undertakings, primarily in engineering, staffing, administration and water rates. To this end Staines reservoir was opened in 1904, the Kempton Park works in 1906, Walton reservoir in 1907, Honor Oak reservoir in 1909, and Island Barn reservoir in 1911.
Progress on the financial and administrative side was slower and politically sensitive especially in the rationalisation of water charges. Criticisms of the Board continued through the 1910's and eventually in 1919 it agreed to the setting up of a committee by the Ministry of Health under Sir Horace Monro to review the workings of the 1902 Water Act. The committee reported in 1920, largely supporting the Board's management of the undertaking and the resulting Metropolitan Water Board (Charges) Act of 1921 strengthened its financial position.
In 1914 the Round Pond was closed after three hundred years in operation and on its site in 1920 the Board's new headquarters at New River Head were opened. In 1936 another connection with the early history of the capital's water supply was broken with the decision to allow the lease on Hampstead and Highgate ponds to lapse. It had been in existence since 1543.
In 1947 a Departmental Committee was set up by the Ministry of Health on Greater London Water Supplies with a remit "To examine the present system of water supply administration in the Greater London area and to consider and report on the question whether changes in that system are desirable in the public interest and if so what should be the constitution, powers and duties of the new body or bodies in which control should be rented". The Board was in favour of, in effect, a single regional body based on the hydro-geological area of the London Basin but there was a great deal of opposition to the proposal and nothing of substance was enacted although indirectly it led to the creation of the Thames Water Authority in 1974.
The post war period saw the inauguration of a number of major schemes including the opening of the George VI reservoir at Staines in 1947, the William Girling reservoir at Chingford in 1951, the Ashford Common works in 1958, the Thames to Lee Valley trunk main (to supplement supplies from the River Lee) in 1960, the Elizabeth II reservoir at Walton in 1962 and the Coppermills Works (the last great project completed) in 1972. By 1974 the daily amount of water supplied by the Board had risen from an original 220 million gallons in 1904 to 420 million gallons (with peaks up to 500 million).
The Thames Water Authority came into existence under the 1973 Water Act on 1st August of that year. The last meeting of the Metropolitan Water Board took place on 29th March 1974 and the Authority assumed full control three days later.
Deposited in 1988, as part of a larger accession of records from Thames Water.
Records of the Metropolitan Water Board relating to the Croydon Corporation Waterworks, comprising plans from the Engineering Department including Croydon Corporation Waterworks; Waddon Pumping Station; Stroud Green Waterworks; Surrey Street Pumping Station and water mains, ponds, wells and rivers.
Records arranged in one series: ACC/2558/MW/CC/01: Plans.
Available for general access.
Copyright to these records rests with the depositor.
English
Fit
Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm
Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
November 2009 to February 2010 Water utilities Water supply Water Drinking water Information sources Documents Business records Water resources management Water consumption Engineering Water-supply engineering Mechanical equipment Hydraulic equipment Pumping stations Enterprises Companies Utility companies Water companies Utilities Service industries Waterworks Industrial facilities Facilities Company archives Metropolitan Water Board London England UK Western Europe Europe Croydon (district) Croydon Surrey
Source immédiate d'acquisition ou de transfert
Deposited in 1988, as part of a larger accession of records from Thames Water.
Zone du contenu et de la structure
Portée et contenu
Records of the Metropolitan Water Board relating to the Croydon Corporation Waterworks, comprising plans from the Engineering Department including Croydon Corporation Waterworks; Waddon Pumping Station; Stroud Green Waterworks; Surrey Street Pumping Station and water mains, ponds, wells and rivers.
Évaluation, élimination et calendrier de conservation
Accroissements
Mode de classement
Records arranged in one series: ACC/2558/MW/CC/01: Plans.
Zone des conditions d'accès et d'utilisation
Conditions d'accès
Available for general access.
Conditions de reproduction
Copyright to these records rests with the depositor.
Langue des documents
- anglais
Écriture des documents
- latin
Notes de langue et graphie
English
Caractéristiques matérielle et contraintes techniques
Instruments de recherche
Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm
Zone des sources complémentaires
Existence et lieu de conservation des originaux
Existence et lieu de conservation des copies
Unités de description associées
Zone des notes
Identifiant(s) alternatif(s)
Mots-clés
Mots-clés - Sujets
- Gestion des ressources en eau » Alimentation en eau
- Eau
- Eau » Eau potable
- Source d'information
- Document
- Gestion des ressources en eau
- Gestion des ressources en eau » Consommation d'eau
- Ingénierie
- Équipement mécanique
- Équipement mécanique » Équipement hydraulique
- Entreprise
- Secteur tertiaire
- Installation industrielle
Mots-clés - Lieux
Mots-clés - Noms
Mots-clés - Genre
Zone du contrôle de la description
Identifiant de la description
Identifiant du service d'archives
Règles et/ou conventions utilisées
Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
Statut
Niveau de détail
Dates de production, de révision, de suppression
Langue(s)
- anglais