Identity area
Reference code
Title
Date(s)
- 1666 (Creation)
Level of description
Extent and medium
0.16 linear metres
Context area
Name of creator
Biographical history
During the late 16th century the need for a fresh water supply to the City of London became increasingly apparent. The city was served by an inadequate number of conduits, and its main source of fresh water - the River Thames - was contaminated by sewage and refuse.
After several abortive attempts at legislation, the Corporation of London finally accepted the offer of Hugh Myddelton, a goldsmith of the city, to complete a new conduit in four years. This was in 1609, and by September 1613 the work was duly completed. The conduit, known as the New River, rises from Chadwell Spring in Hertfordshire, and runs approximately 40 miles, finally ending in the Round Pond at New River Head, behind Sadlers Wells Theatre in Rosebery Avenue. As well as providing water for the citizens of London, the New River Company owned a great deal of property along the course of the river, in both Hertfordshire and London.
James I granted a charter to the New River Company in June 1619, and it was incorporated under the title of 'The Governor and Company of the New River brought from Chadwell and Amwell to London'. The seal of the company depicted the 'hand of Providence bestowing rain' upon the city and its motto was "et plui super unam civitatem" (and I rained upon one city).
Capital for the venture was provided jointly by James I and Hugh Myddelton, along with 28 other 'Adventurers'. On the incorporation of the company the two parties divided the shares between them; James I owned the King's Shares. The Adventurers' Shares were divided into 36 parts, 22 of the directors owning one part, and 7 others (including Hugh Myddelton) owning two.
The function of the company as a public utility ceased with the passing of the Metropolis Water Act in 1902. By this act the provision of London's water supply was passed from the various water companies to the newly-created Metropolitan Water Board.
As a result of this takeover, the New River Company was re-incorporated in 1904 as a modern property company. It was registered under The Companies Acts 1862-1900 as The New River Company (Limited). The Company was taken over again in 1974 by London Merchant Securities, but still exists as a separate entity within that group.
Repository
Archival history
GB 0074 ACC/2246 1666 Collection 0.16 linear metres New River Company
During the late 16th century the need for a fresh water supply to the City of London became increasingly apparent. The city was served by an inadequate number of conduits, and its main source of fresh water - the River Thames - was contaminated by sewage and refuse.
After several abortive attempts at legislation, the Corporation of London finally accepted the offer of Hugh Myddelton, a goldsmith of the city, to complete a new conduit in four years. This was in 1609, and by September 1613 the work was duly completed. The conduit, known as the New River, rises from Chadwell Spring in Hertfordshire, and runs approximately 40 miles, finally ending in the Round Pond at New River Head, behind Sadlers Wells Theatre in Rosebery Avenue. As well as providing water for the citizens of London, the New River Company owned a great deal of property along the course of the river, in both Hertfordshire and London.
James I granted a charter to the New River Company in June 1619, and it was incorporated under the title of 'The Governor and Company of the New River brought from Chadwell and Amwell to London'. The seal of the company depicted the 'hand of Providence bestowing rain' upon the city and its motto was "et plui super unam civitatem" (and I rained upon one city).
Capital for the venture was provided jointly by James I and Hugh Myddelton, along with 28 other 'Adventurers'. On the incorporation of the company the two parties divided the shares between them; James I owned the King's Shares. The Adventurers' Shares were divided into 36 parts, 22 of the directors owning one part, and 7 others (including Hugh Myddelton) owning two.
The function of the company as a public utility ceased with the passing of the Metropolis Water Act in 1902. By this act the provision of London's water supply was passed from the various water companies to the newly-created Metropolitan Water Board.
As a result of this takeover, the New River Company was re-incorporated in 1904 as a modern property company. It was registered under The Companies Acts 1862-1900 as The New River Company (Limited). The Company was taken over again in 1974 by London Merchant Securities, but still exists as a separate entity within that group.
Gifted in 1986.
Lease by the New River Company of a water course from a main pipe in Southampton Street, Covent Garden, 1666. Also marriage allegation, 1752. The marriage allegation was the document in which the couple alleged that there were no impediments to the marriage.
Chronological
Available for general access.
Copyright rests with the City of London.
English
Fit
Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm
Records of the Company relating to the provision of water can be found among the archives of the predecessors of Thames Water (ACC/2558/NR). Further records of the Company (relating to property ownership) can be found at ACC/1262, ACC/1953, ACC/2246, ACC/2643, ACC/2919 and ACC/3645.
For further information relating to the history of the New River Company, see "The New River: A Legal History" by Bernard Rudden, 1985 (LMA Library reference 24.215 NEW) and "Exploring the New River" by Michael Essex-Lopresti, 1986 (LMA Library reference 24.215 NEW).
Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
July to October 2009 Information sources Documents Marriage records Water supply Water resources management New River Company
Immediate source of acquisition or transfer
Gifted in 1986.
Content and structure area
Scope and content
Lease by the New River Company of a water course from a main pipe in Southampton Street, Covent Garden, 1666. Also marriage allegation, 1752. The marriage allegation was the document in which the couple alleged that there were no impediments to the marriage.
Appraisal, destruction and scheduling
Accruals
System of arrangement
Chronological
Conditions of access and use area
Conditions governing access
Available for general access.
Conditions governing reproduction
Copyright rests with the City of London.
Language of material
- English
Script of material
- Latin
Language and script notes
English
Physical characteristics and technical requirements
Records of the Company relating to the provision of water can be found among the archives of the predecessors of Thames Water (ACC/2558/NR). Further records of the Company (relating to property ownership) can be found at ACC/1262, ACC/1953, ACC/2246, ACC/2643, ACC/2919 and ACC/3645.
Finding aids
Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Alternative identifier(s)
Access points
Subject access points
Place access points
Name access points
Genre access points
Description control area
Description identifier
Institution identifier
Rules and/or conventions used
Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
Status
Level of detail
Dates of creation revision deletion
Language(s)
- English