Área de identidad
Código de referencia
Título
Fecha(s)
- 1854-2003 (Creación)
Nivel de descripción
Volumen y soporte
1 box, 155 files, 35 volumes, 227 plans, 2 photograph albums.
Área de contexto
Nombre del productor
Historia biográfica
The Post Office (London) Railway was opened for traffic in December 1927. The Post Office first showed an interest in using underground railways to transport mail beneath London in 1854 and in 1893 serious consideration was given to running an electric railway in the pneumatic tunnels. By the turn of the twentieth century, traffic congestion in London had reached the point that cross-London journeys by road took so long that an unnecessary number of vehicles had to be used to carry the ever growing volume of mails between sorting offices and main line termini. In 1905, the Metropolitan Pneumatic Despatch Co presented a bill to Parliament for the construction of a pneumatic line connecting the major railway termini and Post Offices. The Bill was rejected as being too ambitious. In September 1909 the Postmaster General appointed a Committee to examine the practicality of the transmission of mails in London by pneumatic tube or electric railway. The Committee reported in February 1911 in favour of an electric railway between Paddington Station (Great Western Railway) and the Eastern District Post Office in Whitechapel Road, a distance of six and a half miles.
The scheme was submitted by the Postmaster General to the Cabinet in 1912 and power to construct the railway was given to the Postmaster General by the Post Office (London) Railway Act, 1913. The Act made provision for compensation for damage and allowed the Post Office a budget of £1,100,000 to construct the line with stations at Paddington, Western District Office, Western Parcel Office, West Central District Office, Mount Pleasant Sorting Office, King Edward Building, Liverpool Street and East District Office. Tenders for the construction of the tunnel were invited on the 26 August 1914. John Mowland and Co. won the tender to construct the tunnels and build eight stations. The work, although interrupted by the war, was completed in 1917. In parallel with the building work, Post Office engineers built a test track on Plumstead Marshes to experiment with the control systems and rolling stock. However, the war caused the testing to be brought to a premature halt. During the war the stations became a home for exhibits from museums. The cessation of the war enabled the Post Office to proceed with their plans, and in 1919 tenders were issued for the supply and installation of the electrical equipment. Prices proved too expensive for the post war budget and the scheme was held in abeyance until 1923 when tenders were reissued.
In May 1927, work was sufficiently advanced for half the system to be handed over for staff training and in December of that year the scheme received Parliamentary approval and the line became fully operational with parcels traffic running between Mount Pleasant and Paddington. Mount Pleasant to Liverpool Street opened for Christmas parcels from 19-24 December and then for a full parcels service from 28 December. Liverpool Street to Eastern District Office opened for parcels on 2 January 1928. Letter traffic began on 13 February with the opening of West Central District Office station, followed by Western District Office on 12 March. The line proved an immense benefit to the Post Office in the first year of operation, however the high mileage gave the Post Office problems as the cars needed a lot of maintenance. In the early 1930s the rolling stock underwent a gradual change as the cars were replaced by three car trains. These trains were replaced by 34 new trains in 1981 in a £1 million development programme.
In a Press Release, issued by the Post Office PR team on 7 November 2002, Royal Mail announced that unless it could find a new backer, that the Post Office underground railway would close in the near future. The working operation finally ceased on 30 May 2003, but the system has in fact been 'mothballed' in the hope that an alternative use can be found for it.
Institución archivística
Historia archivística
GB 0813 POST 20 Series 1854-2003 Series 1 box, 155 files, 35 volumes, 227 plans, 2 photograph albums.
No further information available
The Post Office (London) Railway was opened for traffic in December 1927. The Post Office first showed an interest in using underground railways to transport mail beneath London in 1854 and in 1893 serious consideration was given to running an electric railway in the pneumatic tunnels. By the turn of the twentieth century, traffic congestion in London had reached the point that cross-London journeys by road took so long that an unnecessary number of vehicles had to be used to carry the ever growing volume of mails between sorting offices and main line termini. In 1905, the Metropolitan Pneumatic Despatch Co presented a bill to Parliament for the construction of a pneumatic line connecting the major railway termini and Post Offices. The Bill was rejected as being too ambitious. In September 1909 the Postmaster General appointed a Committee to examine the practicality of the transmission of mails in London by pneumatic tube or electric railway. The Committee reported in February 1911 in favour of an electric railway between Paddington Station (Great Western Railway) and the Eastern District Post Office in Whitechapel Road, a distance of six and a half miles.
The scheme was submitted by the Postmaster General to the Cabinet in 1912 and power to construct the railway was given to the Postmaster General by the Post Office (London) Railway Act, 1913. The Act made provision for compensation for damage and allowed the Post Office a budget of £1,100,000 to construct the line with stations at Paddington, Western District Office, Western Parcel Office, West Central District Office, Mount Pleasant Sorting Office, King Edward Building, Liverpool Street and East District Office. Tenders for the construction of the tunnel were invited on the 26 August 1914. John Mowland and Co. won the tender to construct the tunnels and build eight stations. The work, although interrupted by the war, was completed in 1917. In parallel with the building work, Post Office engineers built a test track on Plumstead Marshes to experiment with the control systems and rolling stock. However, the war caused the testing to be brought to a premature halt. During the war the stations became a home for exhibits from museums. The cessation of the war enabled the Post Office to proceed with their plans, and in 1919 tenders were issued for the supply and installation of the electrical equipment. Prices proved too expensive for the post war budget and the scheme was held in abeyance until 1923 when tenders were reissued.
In May 1927, work was sufficiently advanced for half the system to be handed over for staff training and in December of that year the scheme received Parliamentary approval and the line became fully operational with parcels traffic running between Mount Pleasant and Paddington. Mount Pleasant to Liverpool Street opened for Christmas parcels from 19-24 December and then for a full parcels service from 28 December. Liverpool Street to Eastern District Office opened for parcels on 2 January 1928. Letter traffic began on 13 February with the opening of West Central District Office station, followed by Western District Office on 12 March. The line proved an immense benefit to the Post Office in the first year of operation, however the high mileage gave the Post Office problems as the cars needed a lot of maintenance. In the early 1930s the rolling stock underwent a gradual change as the cars were replaced by three car trains. These trains were replaced by 34 new trains in 1981 in a £1 million development programme.
In a Press Release, issued by the Post Office PR team on 7 November 2002, Royal Mail announced that unless it could find a new backer, that the Post Office underground railway would close in the near future. The working operation finally ceased on 30 May 2003, but the system has in fact been 'mothballed' in the hope that an alternative use can be found for it.
Please contact the Archive for further information.
This series relates to the conveyance of mails by Underground pneumatic tube in London. It comprises reports and papers produced and used by the committee appointed in 1909 by the Postmaster General to consider the introduction of the underground transmission of mails within London and plans of the proposed route for the railway, showing rail levels and junctions. It also contains a copy of the Post Office (London) Railway act and the patent granted to Hosiah Latimer Clark for the invention of apparatus for conveying post by pneumatic tube, (POST 20/30). Papers relating to the construction, maintenance and expansion of the Post Office (London) Railway are also present including specifications, invitations to tender, conditions of contract, estimate of costs and technical plans relating to the construction of new stations, car depots, subways, additions and alterations to stations, including the fitting and maintenance of electrical equipment. This is also demonstrated through numerous plans held within the collection. As well as the Manager's annual reports, there are also numerous files of miscellaneous correspondence, memoranda and reports from the Post Office to various departments and organisations regarding the Post Office (London) Railway, historical accounts. There are also two photograph albums of railway equipment and work being carried out on it.
Some of the plans show properties purchased by the Post Office following the passage of the Post Office (London) Railway Act in 1913. There is a series of signed plans dated 26 October 1914 showing the depth and route of the Post Office (London) railway below ground with details of tunnels, shield chambers, and shafts. There is also a series of plans marking individual and corporate properties along the proposed route of the Post Office Railway.
Arranged chronologically as far as possible within series.
Public Record
Please contact the Archive for further information.
English
Please contact the Archive for further information.
POST 20/21 - Post Office (London) Railway Rules and Regulations, 1932 was transferred to POST 68/571.
Entry checked by Barbara Ball
Compiled in compliance with General Internation Standard Archival Description, ISAD(G) second edition 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
Entry checked June 2011 Railway transport Information sources Postal services Documents Reports Underground railway networks Post Office Underground Railway Railways Transport Communication industry Transport infrastructure
Origen del ingreso o transferencia
Please contact the Archive for further information.
Área de contenido y estructura
Alcance y contenido
This series relates to the conveyance of mails by Underground pneumatic tube in London. It comprises reports and papers produced and used by the committee appointed in 1909 by the Postmaster General to consider the introduction of the underground transmission of mails within London and plans of the proposed route for the railway, showing rail levels and junctions. It also contains a copy of the Post Office (London) Railway act and the patent granted to Hosiah Latimer Clark for the invention of apparatus for conveying post by pneumatic tube, (POST 20/30). Papers relating to the construction, maintenance and expansion of the Post Office (London) Railway are also present including specifications, invitations to tender, conditions of contract, estimate of costs and technical plans relating to the construction of new stations, car depots, subways, additions and alterations to stations, including the fitting and maintenance of electrical equipment. This is also demonstrated through numerous plans held within the collection. As well as the Manager's annual reports, there are also numerous files of miscellaneous correspondence, memoranda and reports from the Post Office to various departments and organisations regarding the Post Office (London) Railway, historical accounts. There are also two photograph albums of railway equipment and work being carried out on it.
Some of the plans show properties purchased by the Post Office following the passage of the Post Office (London) Railway Act in 1913. There is a series of signed plans dated 26 October 1914 showing the depth and route of the Post Office (London) railway below ground with details of tunnels, shield chambers, and shafts. There is also a series of plans marking individual and corporate properties along the proposed route of the Post Office Railway.
Valorización, destrucción y programación
Acumulaciones
Sistema de arreglo
Arranged chronologically as far as possible within series.
Área de condiciones de acceso y uso
Condiciones de acceso
Public Record
Condiciones
Please contact the Archive for further information.
Idioma del material
- inglés
Escritura del material
- latín
Notas sobre las lenguas y escrituras
English
Características físicas y requisitos técnicos
POST 20/21 - Post Office (London) Railway Rules and Regulations, 1932 was transferred to POST 68/571.
Instrumentos de descripción
Please contact the Archive for further information.
Área de materiales relacionados
Existencia y localización de originales
Existencia y localización de copias
Unidades de descripción relacionadas
Área de notas
Identificador/es alternativo(os)
Puntos de acceso
Puntos de acceso por lugar
Puntos de acceso por autoridad
Tipo de puntos de acceso
Área de control de la descripción
Identificador de la descripción
Identificador de la institución
Reglas y/o convenciones usadas
Compiled in compliance with General Internation Standard Archival Description, ISAD(G) second edition 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.
Estado de elaboración
Nivel de detalle
Fechas de creación revisión eliminación
Idioma(s)
- inglés