Colección GB 0074 ACC/2558/SV/08 - SOUTHWARK AND VAUXHALL WATER COMPANY: CORPORATE AND SOUTH LONDON WATERWORKS COMPANY RECORDS

Área de identidad

Código de referencia

GB 0074 ACC/2558/SV/08

Título

SOUTHWARK AND VAUXHALL WATER COMPANY: CORPORATE AND SOUTH LONDON WATERWORKS COMPANY RECORDS

Fecha(s)

  • 1805-1950 (Creación)

Nivel de descripción

Colección

Volumen y soporte

2.67 linear metres

Área de contexto

Nombre del productor

Historia biográfica

The South London Water Works Company was incorporated in 1805 and originally drew its water from the Effra which flowed into the Thames at Vauxhall Creek. The company constructed works at Kennington and Vauxhall Bridge. In 1832 the supply of water from the Effra was abandoned as the water was polluted and silted up. Two years later, in 1834, the company changed its name to the Vauxhall Water Works Company and a limitation on its right to supply part of Lambeth and Newington (already within the Lambeth Water Works Company's area) was lifted at the same time by statute.

In 1718 a grant was made by the City of London to Francis Wilkinson to supply water to Southwark, procuring water from the Thames. In 1761 the London Bridge Water Works bought this business from a James Whitchurch whose father had acquired it from Wilkinson. In 1822 the New River Company took over the London Bridge Water Works and sold this Southwark interest to John Edwards Vaughan who, in 1820, had become the proprietor of another undertaking, the Borough Waterworks. In July 1834 the Southwark Water Company was incorporated and empowered to buy up Vaughan's undertaking and to construct new works at Battersea. The old intake at Bankside was abandoned at the same time and a temporary supply was taken from the Lambeth Company. In 1845 new works were built at Battersea on the approximate side of the Power Station and in 1855 an intake from the Thames was introduced at Hampton. Wells were also sunk at Streatham, Honor Oak and Merton Abbey in 1888 and 1902. In 1861 the Company took over the Richmond Water Company.

Between 1839 and 1842 there was a period of unfruitful competition between the Vauxhall company and the Southwark and Lambeth companies. Eventually in 1845 the Southwark and the Vauxhall companies were amalgamated to form The Southwark and Vauxhall Water Company. The works at Kennington were dismantled and conveyed to the Phoenix Gas Company in 1847.

The Southwark and Vauxhall Water Company acquired land at Hampton in 1851 and in 1852 an Act was obtained to sanction the construction of new works and to enlarge the authorised supply area. In 1870 the company began filtering the water at Hampton and the following year, in order to prepare for the introduction of constant supply, decided to construct four covered reservoirs at Nunhead. Peckham, to be supplied with filtered water from Hampton.

A high service reservoir was built on Forest Hill in 1887 and a pumping station at Wandsworth was brought into use in 1891 for pumping to Wimbledon and the higher levels. Wells were sunk at Streatham in 1888 and later at Honor Oak (1901) and Merton Abbey (1902). Throughout the 1890s additions were made to the Hampton works and by 1903 the company was able to dispense with the Battersea Works.

As a result of the Metropolis Water Act 1902, the Metropolitan Water Board took over the functions of the Southwark and Vauxhall Water Company in 1904. When it did so the company was in the course of constructing storage reservoirs at Honor Oak and Walton.

Institución archivística

Historia archivística

Prior to their transfer to the Greater London Record Office, the records of the Southwark and Vauxhall Water Company were housed in muniment rooms at Thames Water premises, Seething Wells, Surbiton and at New River Head, Rosebery Avenue, EC1.

GB 0074 ACC/2558/SV/08 1805-1950 Collection 2.67 linear metres Southwark and Vauxhall Water Company
South London Waterworks Company

The South London Water Works Company was incorporated in 1805 and originally drew its water from the Effra which flowed into the Thames at Vauxhall Creek. The company constructed works at Kennington and Vauxhall Bridge. In 1832 the supply of water from the Effra was abandoned as the water was polluted and silted up. Two years later, in 1834, the company changed its name to the Vauxhall Water Works Company and a limitation on its right to supply part of Lambeth and Newington (already within the Lambeth Water Works Company's area) was lifted at the same time by statute.

In 1718 a grant was made by the City of London to Francis Wilkinson to supply water to Southwark, procuring water from the Thames. In 1761 the London Bridge Water Works bought this business from a James Whitchurch whose father had acquired it from Wilkinson. In 1822 the New River Company took over the London Bridge Water Works and sold this Southwark interest to John Edwards Vaughan who, in 1820, had become the proprietor of another undertaking, the Borough Waterworks. In July 1834 the Southwark Water Company was incorporated and empowered to buy up Vaughan's undertaking and to construct new works at Battersea. The old intake at Bankside was abandoned at the same time and a temporary supply was taken from the Lambeth Company. In 1845 new works were built at Battersea on the approximate side of the Power Station and in 1855 an intake from the Thames was introduced at Hampton. Wells were also sunk at Streatham, Honor Oak and Merton Abbey in 1888 and 1902. In 1861 the Company took over the Richmond Water Company.

Between 1839 and 1842 there was a period of unfruitful competition between the Vauxhall company and the Southwark and Lambeth companies. Eventually in 1845 the Southwark and the Vauxhall companies were amalgamated to form The Southwark and Vauxhall Water Company. The works at Kennington were dismantled and conveyed to the Phoenix Gas Company in 1847.

The Southwark and Vauxhall Water Company acquired land at Hampton in 1851 and in 1852 an Act was obtained to sanction the construction of new works and to enlarge the authorised supply area. In 1870 the company began filtering the water at Hampton and the following year, in order to prepare for the introduction of constant supply, decided to construct four covered reservoirs at Nunhead. Peckham, to be supplied with filtered water from Hampton.

A high service reservoir was built on Forest Hill in 1887 and a pumping station at Wandsworth was brought into use in 1891 for pumping to Wimbledon and the higher levels. Wells were sunk at Streatham in 1888 and later at Honor Oak (1901) and Merton Abbey (1902). Throughout the 1890s additions were made to the Hampton works and by 1903 the company was able to dispense with the Battersea Works.

As a result of the Metropolis Water Act 1902, the Metropolitan Water Board took over the functions of the Southwark and Vauxhall Water Company in 1904. When it did so the company was in the course of constructing storage reservoirs at Honor Oak and Walton.

Prior to their transfer to the Greater London Record Office, the records of the Southwark and Vauxhall Water Company were housed in muniment rooms at Thames Water premises, Seething Wells, Surbiton and at New River Head, Rosebery Avenue, EC1.

Deposited in 1988, as part of a larger accession of records from Thames Water.

Records of the South London Waterworks Company (later the Southwark and Vauxhall Water Company) including papers relating to shares; minutes of Director's meetings; stock certificates; papers relating to works and papers relating to a lawsuit.

Within each company the records are divided as follows:
A (1) Corporate Records - including board minutes, parliamentary and legal papers.
B (2) Accounting Records - these are usually very extensive but do not include stocks and shares records which appear in section A.
C (3) Staff Records.
D (4) Water Supply and Distribution Records - including engineering and technical files.
E (5) Purchase Records - including stock books.
F (6) Property Records - many property matters are however dealt with in the legal papers in section A.
G (7) Miscellaneous Records.

Available for general access.

Copyright to these records rests with the depositor.

English

Fit

Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm

Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.

November 2009 to February 2010 Facilities Industrial facilities Waterworks Service industries Utilities Water utilities Water supply Water Drinking water Information sources Documents Business records Water resources management Water consumption Finance Investment Financial markets Share dealing Engineering Water-supply engineering Management Business management Enterprises Companies Utility companies Water companies Business administration Company archives Southwark and Vauxhall Water Company South London Waterworks Company Southwark Water Company Vauxhall Waterworks Company Vauxhall Surrey Lambeth (district) Lambeth London England UK Western Europe Europe Southwark (district) Southwark Business

Origen del ingreso o transferencia

Deposited in 1988, as part of a larger accession of records from Thames Water.

Área de contenido y estructura

Alcance y contenido

Records of the South London Waterworks Company (later the Southwark and Vauxhall Water Company) including papers relating to shares; minutes of Director's meetings; stock certificates; papers relating to works and papers relating to a lawsuit.

Valorización, destrucción y programación

Acumulaciones

Sistema de arreglo

Within each company the records are divided as follows:
A (1) Corporate Records - including board minutes, parliamentary and legal papers.
B (2) Accounting Records - these are usually very extensive but do not include stocks and shares records which appear in section A.
C (3) Staff Records.
D (4) Water Supply and Distribution Records - including engineering and technical files.
E (5) Purchase Records - including stock books.
F (6) Property Records - many property matters are however dealt with in the legal papers in section A.
G (7) Miscellaneous Records.

Área de condiciones de acceso y uso

Condiciones de acceso

Available for general access.

Condiciones

Copyright to these records rests with the depositor.

Idioma del material

  • inglés

Escritura del material

  • latín

Notas sobre las lenguas y escrituras

English

Características físicas y requisitos técnicos

Instrumentos de descripción

Please see online catalogues at: http://search.lma.gov.uk/opac_lma/index.htm

Área de materiales relacionados

Existencia y localización de originales

Existencia y localización de copias

Unidades de descripción relacionadas

Descripciones relacionadas

Área de notas

Identificador/es alternativo(os)

Puntos de acceso

Puntos de acceso por lugar

Puntos de acceso por autoridad

Tipo de puntos de acceso

Área de control de la descripción

Identificador de la descripción

Identificador de la institución

London Metropolitan Archives

Reglas y/o convenciones usadas

Compiled in compliance with General International Standard Archival Description, ISAD(G), second edition, 2000; National Council on Archives Rules for the Construction of Personal, Place and Corporate Names, 1997.

Estado de elaboración

Nivel de detalle

Fechas de creación revisión eliminación

Idioma(s)

  • inglés

Escritura(s)

    Fuentes

    Área de Ingreso