Southwark and Vauxhall Water Company South London Waterworks Company

Zona de identificação

Tipo de entidade

Forma autorizada do nome

Southwark and Vauxhall Water Company South London Waterworks Company

Forma(s) paralela(s) de nome

    Formas normalizadas do nome de acordo com outras regras

      Outra(s) forma(s) de nome

        identificadores para entidades coletivas

        Área de descrição

        Datas de existência

        Histórico

        The South London Water Works Company was incorporated in 1805 and originally drew its water from the Effra which flowed into the Thames at Vauxhall Creek. The company constructed works at Kennington and Vauxhall Bridge. In 1832 the supply of water from the Effra was abandoned as the water was polluted and silted up. Two years later, in 1834, the company changed its name to the Vauxhall Water Works Company and a limitation on its right to supply part of Lambeth and Newington (already within the Lambeth Water Works Company's area) was lifted at the same time by statute.

        In 1718 a grant was made by the City of London to Francis Wilkinson to supply water to Southwark, procuring water from the Thames. In 1761 the London Bridge Water Works bought this business from a James Whitchurch whose father had acquired it from Wilkinson. In 1822 the New River Company took over the London Bridge Water Works and sold this Southwark interest to John Edwards Vaughan who, in 1820, had become the proprietor of another undertaking, the Borough Waterworks. In July 1834 the Southwark Water Company was incorporated and empowered to buy up Vaughan's undertaking and to construct new works at Battersea. The old intake at Bankside was abandoned at the same time and a temporary supply was taken from the Lambeth Company. In 1845 new works were built at Battersea on the approximate side of the Power Station and in 1855 an intake from the Thames was introduced at Hampton. Wells were also sunk at Streatham, Honor Oak and Merton Abbey in 1888 and 1902. In 1861 the Company took over the Richmond Water Company.

        Between 1839 and 1842 there was a period of unfruitful competition between the Vauxhall company and the Southwark and Lambeth companies. Eventually in 1845 the Southwark and the Vauxhall companies were amalgamated to form The Southwark and Vauxhall Water Company. The works at Kennington were dismantled and conveyed to the Phoenix Gas Company in 1847.

        The Southwark and Vauxhall Water Company acquired land at Hampton in 1851 and in 1852 an Act was obtained to sanction the construction of new works and to enlarge the authorised supply area. In 1870 the company began filtering the water at Hampton and the following year, in order to prepare for the introduction of constant supply, decided to construct four covered reservoirs at Nunhead. Peckham, to be supplied with filtered water from Hampton.

        A high service reservoir was built on Forest Hill in 1887 and a pumping station at Wandsworth was brought into use in 1891 for pumping to Wimbledon and the higher levels. Wells were sunk at Streatham in 1888 and later at Honor Oak (1901) and Merton Abbey (1902). Throughout the 1890s additions were made to the Hampton works and by 1903 the company was able to dispense with the Battersea Works.

        As a result of the Metropolis Water Act 1902, the Metropolitan Water Board took over the functions of the Southwark and Vauxhall Water Company in 1904. When it did so the company was in the course of constructing storage reservoirs at Honor Oak and Walton.

        Locais

        Estado Legal

        Funções, ocupações e atividades

        Mandatos/fontes de autoridade

        Estruturas internas/genealogia

        Contexto geral

        Área de relacionamentos

        Área de pontos de acesso

        Pontos de acesso - Assuntos

        Pontos de acesso - Locais

        Ocupações

        Zona do controlo

        Identificador de autoridade arquivística de documentos

        Identificador da instituição

        Regras ou convenções utilizadas

        Estatuto

        Nível de detalhe

        Datas de criação, revisão ou eliminação

        Línguas e escritas

          Script(s)

            Fontes

            Notas de manutenção