London and Birmingham Railway

Identity area

Type of entity

Authorized form of name

London and Birmingham Railway

Parallel form(s) of name

    Standardized form(s) of name according to other rules

      Other form(s) of name

        Identifiers for corporate bodies

        Description area

        Dates of existence

        History

        The London and Birmingham Railway was sanctioned in 1833, and the Company appointed Robert Stephenson as chief engineer. Its construction was dogged by much opposition. The 112 mile long London to Birmingham line took 20,000 men nearly five years to build. The total cost of building the railway was £5,500,000 (£50,000 a mile). The railway was opened in stages and finally completed on 17 September 1838. The line started at Birmingham's Curzon Street Station and finished at Euston Station in London.

        Places

        Legal status

        Functions, occupations and activities

        Mandates/sources of authority

        Internal structures/genealogy

        General context

        Relationships area

        Access points area

        Subject access points

        Place access points

        Occupations

        Control area

        Authority record identifier

        Institution identifier

        Rules and/or conventions used

        Status

        Level of detail

        Dates of creation, revision and deletion

        Language(s)

          Script(s)

            Sources

            Maintenance notes