London and Birmingham Railway

Identificatie

Soort entiteit

Geauthoriseerde naam

London and Birmingham Railway

Parallelle vormen van de naam

    Gestandaardiseerde naamvorm(en) volgens andere regels.

      Aandere naamsvormen

        Identificatiecode voor organisaties

        Beschrijving

        Bestaansperiode

        Geschiedenis

        The London and Birmingham Railway was sanctioned in 1833, and the Company appointed Robert Stephenson as chief engineer. Its construction was dogged by much opposition. The 112 mile long London to Birmingham line took 20,000 men nearly five years to build. The total cost of building the railway was £5,500,000 (£50,000 a mile). The railway was opened in stages and finally completed on 17 September 1838. The line started at Birmingham's Curzon Street Station and finished at Euston Station in London.

        Plaatsen

        Rechtsvorm

        Functies, beroepen en activiteiten

        Mandaat/bronnen van bevoegdheid

        Interne structuren / genealogie

        Algemene context

        relaties

        Access points area

        Onderwerp trefwoord

        Geografische trefwoorden

        Occupations

        Beheer

        Authority record identifier

        Identificatiecode van de instelling

        Toegepaste regels en/of conventies

        Status

        Niveau van detaillering

        Datering van aanmaak, herziening of verwijdering

        Taal (talen)

          Schrift(en)

            Bronnen

            Onderhoudsaantekeningen